Finish Master Bath Shower

Finished tiling the shower, grout and seal grout.


Finish Master Bath Floor

Install floor heat matting. Tile over floor heat, grout and seal grout.


Mudding or Joint Compounding


We had to mud the entire hallway and master bedroom walls. There was something similar to a popcorn texture applied to the walls that we didn't like. We tried to sand down this texture when we did the guest bedroom but it didn't come out the way we wanted so we tried this other option.

The sanding aftermath


Priming


Testing paint samples


Painting & Install Shelving



Moved Into Bedroom & Moved All Pieces To Bathroom For Assembly